Installation Steps
Secure the junction box to an appropriate location on the scale body. Open the junction box cover and feed the load cell cables and the instrument signal cable through the corresponding ports. Connect all cables according to the provided wiring diagram and tighten all nuts securely upon completion. Seal any unused ports with rubber gaskets or modeling clay and tighten the corresponding nuts; also, connect the outer shields of all cables to the junction box's grounding post.
Corner Error Adjustment
Corner error adjustment generally follows these steps: identify and match the load cell leads with the junction box terminals, check the terminal labels to determine the function of each lead, and locate the zero-adjustment leads on the load cells and connect them to the corresponding terminals in the junction box. Perform the adjustment-usually by rotating or adjusting the zero-adjustment mechanism or screw on the load cell. Specifically, with the adjustable resistor set to its midpoint, record the maximum and minimum readings at each corner during an off-center load test and calculate the average; then, adjust each load cell's resistor so the instrument displays this average value (this is an iterative process). Since mechanical platform and foundation deformations can cause uneven load distribution among sensors, first adjust the sensor heights to bring readings within a ±3d range, then use the potentiometers to compensate and equalize the readings (again, an iterative process). If the junction box potentiometers have been misadjusted, remove the terminal board and set all potentiometers to the same resistance value; verify with a multimeter that the resistance measured at each sensor's signal input terminal is identical, then reconnect the circuit board to the sensors to proceed with adjustment.